Pioneer Park in Peoria, IL

Pioneer Park is the host of a 15.87 kW solar array that powers a Periodontist office and two other units in the building. This array was installed in early 2019, and is expected to produce about 20,000 kWh per year. Forty six REC 345 panels make up this array with a SolarEdge inverter. The payback for this array is expected to be 4.9 years and will have over $83,000 in electric bill savings over thirty years. If you saw the video online and wish to get more information, please fill out the form and enter the code Lemon Pound Cake so we know how you heard about us.